Sunday, May 25, 2008

Take-off: GPS draw bending route

15:30, the earthquake relief command center order: "Pingzhen-speed delivery of trouble to the masses." Half an hour later, navigator Cui Junfeng route data input will be the lower right corner of the Doppler aircraft cockpit navigation computers, will be landing Enter the latitude and longitude points airborne GPS. Soon, in front of the aircraft cockpit displays on the screen integrated, pop an electronic map, a winding, the red line of the flight route. The bottom of the screen, also showed that the estimated time of arrival, range, direction and other data. "This is the route of the red line." Du Xuebing, pointing to screen told reporters that "we have advanced airborne equipment and excellent crew, will certainly be able to quickly and efficiently complete the task." 16 o'clock sharp, All materials placed Jincang, aviation fuel to add completed, Du Xuebing comrades-in-arms and crew also completed a pre-flight inspection of the final round, with the Tower of the order, the rescue helicopter fly to the rapid-Pingzhen.

No comments: